Nordex has secured a 51.7 MW turbine order from Teut Energieprojekte for the Mürow-Neukünkendorf wind farm in Brandenburg, Germany. The company will supply and install nine turbines with rated outputs between 4 and 6 MW.
The agreement includes two service contracts covering a 20-year period. Installation is planned to begin in autumn 2026, with commissioning expected in spring 2027. The turbine mix includes seven N149/5.X units, one N163/6.X, and one N133/4.8, all with hub heights of 164 metres.